Global Mining MMC

DIggIng Up to The Future

SCIP (Sumgayit Chemical Industrial Park) Project

Project: SKIP

Client: OOO “MNAF”

Location: Sumqayit city

Area: 94.13 ha

Description: Construction of engineering lines and highways (internal highway, underground technical infrastructure gallery, fire protection water, rainwater, drinking water, chemical waste water lines, reservoir and pumping station, sewage system) on the 94.13 ha area of Sumgayit Chemical Industrial Park.

Period of Performance: 2016-2018